I Tackled The Tile!!!

The Gingerbread Diaries

Yes, that absolutely requires three exclamation points.

Y’all, as many small, behind the scenes things we’ve accomplish over the last 6 weeks–and there have been plenty–the only thing, so far, that looked like real forward progress at first glance was framing in the new wall. And that was weeks ago!

But now, now I have something I can point to and not only claim ownership of (I was feeling very third wheel on a lot of the progress to date) but it signifies a major leap ahead in the finishing of the room (even though we’re nowhere close to being finished).

I present to you… our floor.

IMG_20160229_210415166

Tiled. Grouted. Done!

Since we laid the Hardie backer on Thursday night, that meant we could tile pretty much any time on Saturday. First, though, we needed a trip to Lowe’s for a few more things (including a bit to cut the holes for tub drain and supply lines through the cement board, since we didn’t do those ahead of time… for reasons) and then I needed to dry fit the tile.

Now, our tile came in sheets but it’s not on a mesh like some of the super-small tile patterns, it’s more like strong glue spacers behind the tile pattern? Easily cut with a utility knife. I started my dry fit in the back left corner of the room (the commode quadrant, if you will) and tackled the left border of the room as this was where most of the fiddly bits were for the plumbing lines. The compound tile nippers we picked up that morning were nice and easy to work with and fitting around the pipes was pretty simple.

The dry-fit, minus the part just in front of the door.

The dry-fit, minus the part just in front of the door.

The worst fitting problem was with the air vent–the interior corners were a bitch to cut, since two of them fell squarely into the larger octagons, and I had to recut one of them and piece it in. Such a pain. (And even after tidying up the hole post-grout, the vent still isn’t sitting in properly. I’m probably going to have to chisel out some of the tile. Grrrr!)

Except for that first line of tiles along the left side of the room, every other edge had to be trimmed since the room, despite appearing squared off, isn’t. So it took quite a good chunk of time to fit all of the tile edges to the plywood edges, and I had to send Todd back to Lowe’s (for the third trip of the day) for 5 more sheets of tile to finish out the dry fit of the front, doorway-side edge of the room.

But! Dry fitting everything meant that the actual tiling process went pretty quickly. Having everything already cut, and then stacking each column of tile last to first, and stacking them in a row just outside the room meant I could lay down the mortar for a row, then grab the pre-cut tiles, and just keep on trucking. It made for a long Saturday, but it felt good to get it done!

You can see where the excess mortar creates a slight haze over the tiles. It's a learning experience.

You can see where the excess mortar creates a slight haze over the tiles. It’s a learning experience.

Of course, this was my first time tiling a floor, so mistakes were definitely made. My mortar application wasn’t 100% even, with some deeper pockets here and there, and the excess mortar squished up between the gaps in the tile pattern. On the first row I tried to clean up as I went, but that just made for more of a mess. I’m still not sure that was the right decision, because I spent 6ish hours or so (however long it takes to watch/listen to Fuller House, season 1–all of it) on Sunday afternoon chipping away the mortar that had squished up enough to block where the grout needed to go.

At least the mortar cleaned up easily from the tops of the tiles it got onto.

I'm a messy cook, and a messy tiler, too!

I’m a messy cook, and a messy tiler, too!

After hours of chipping away, I was no longer in the mood to grout, so Monday night, as soon as I got home, I threw on my mortar-encrusted work jeans, strapped on my knee pads, and got to grouting.

Okay, a word about knee pads. We each bought pairs of heavy-duty gel knee pads for the renovation work, and I did wear mine during the dry fit and tiling. But they’re really only comfortable for a few hours. At that point it doesn’t matter how thick the gel padding is, the fact that the base of your knees and the tops of your shins have no natural padding of their own starts to come into play. And the straps of said knee pads eventually work themselves into a single spot behind your knee and start to create friction burns from the shifting as you crawl along the floor.

Almost a week later and my knees still hate me.

IMG_20160301_212651402

TEC Design FX Stain Proof Grout in 922 Silver

Back to grouting. The grout we chose is probably my favorite thing, so far, of the entire project. Dude. It’s disco ball sparkly! It’s pre-mixed, ready to go, and despite smelling like hair dye, it was really easy to work with. Grouting took a total of 2 hours, so not bad at all, and the change it made in the room was amazing! I mean, yes, the contrasting grout lines highlight where my spacing got off (the spaces we bought, the only ones Lowe’s carried, only work with square tiles, so were pretty much useless with the octagonal tiles that made up the majority of our square footage), but I don’t even care! Not only will the darker grout not show dirt as easily as white would have, it sparkles!

Can you see the sparkle? It's there, I promise!

Can you see the sparkle? It’s there, I promise!

Plus, most of it is going to be covered up or obscured by the tub, commode, sink, and rug. Uneven spacing is not the end of my world.

Speaking of the rug situation, I totally scored at Tuesday Morning (which I visited on Tuesday night). I had some time to kill before Beer & Cheer so I popped in to pick up a couple things for Todd’s upcoming birthday party and look at their rugs. I found two that had the burnt orange color I was interested in and the approximate size, but I wasn’t sure which one Todd would like so I bought then both. Thankfully–this is TM, afterall–the larger rug was $20 and the smaller one was $15, and if Todd hated them, I could easily bring them back.

The perfect rug would be the size of the one on the right with the pattern of the one on the left. But perfection is overrated.

The perfect rug would be the size of the one on the right with the pattern of the one on the left. But perfection is overrated.

Turns out, we like both of them for different reasons, so we’re keeping both, and we’ll swap them out at will. The larger rug is an indoor/outdoor rug, so super sturdy, which will be good for when we entertain and this room gets more traffic. The smaller rug is 100% cotton, so will be easy to clean and probably be the day to day rug choice. They both have two shades of orange and the grey in each kind of picks up the silver of the grout. I’m really happy to have that out of the way and to have gotten such a great deal on them!

So what was Todd doing while I was fussing with tile? He was under the house working on the supply lines for the tub, commode, and sink. Everything is now measured and cut, just needs to be assembled. Unfortunately, Thursday (when we thought he’d get home early enough to install them) he came home with a bad toothache and swelling and, yeah, not really in the mood to work. Poor guy!

The goal for the weekend is to get the toilet installed and put up the wall between the hall and the bathroom (and the old doorway to my office), since that’s the bare minimum of what needs to happen before the party in 2 weeks. Ideally, we’d be able to get the sink installed, too (though we’re having trouble finding the right faucet at the moment), and get the drywall up inside the bathroom so the walls look semi-finished, but that’s technically optional. The wall also involves the insulation (which we bought this week) and installing the vent fan, so we’ll just have to see how far we can get.

Here’s hoping Todd can get into the dentist today and will be feeling better soon!

PS! The videos are now up for weeks 5 & 6 in last week’s post. This week’s video will be up much more timely, I hope!

And So It Begins!

The Gingerbread Diaries

Our first room renovation has finally gotten off the ground!

Friday night, after chattering to Todd over dinner about where I though we might start, I noticed he wasn’t exactly jumping for joy at the prospect of a weekend spent tearing down walls.

Jenn: Am I being annoying?
Todd: No, not really.
Jenn: Am I micro-managing?
Todd: Maybe a little.
Jenn: Is that annoying??
Todd: Maybe a little.

In his defense, I was trying to put together a week-by-week plan to make sure we could meet our proposed deadline. It went something like this:

  • Week 1: Take the room down to studs
  • Week 2: Build new wall*
  • Week 3: Electrical and plumbing**
  • Week 4: Drywall and painting***
  • Week 5: Sink/commode-side tiling****
  • Week 6: Sink/commode installation; tub-side tiling
  • Week 7: Install tub
  • Week 8: Finishing touches

But he must have gotten into the spirit of the project because he got up and wiggled some loose clapboards out of the way, just to see what things looked like inside the walls. And on Saturday afternoon we started working on the wall in earnest. Before I get to the what all those asterisks mean, here, have a video!

(Direct link for the feed readers: Gingerbread Diaries 2.3: Downstairs Bath Renovation, Week 1)

*A New Wall, Where Once Was Hall

So, my big idea a few weeks ago was that we could put a pocket door for the bathroom and it would a) be cool, because pocket doors are automatically cool, and b) save some usable space in the hallway since that door is usually half-open, unless the room is occupied. I have Yellow Brick Home to thank for that mini-epiphany–they were talking about an impending barn door project, I believe, which led me on a short path to pocket doors. Then I had the idea that we could gain a little more elbow room in the bathroom by bumping out the wall to where the pipe chase extended. It’s only about 6-8″ so it won’t impact the hallway in any huge way but I think those 6 inches will make a big difference for anyone washing their hands at the new sink.

This does mean, however, that we have to build in support for this wall by adding joists under the house. Thankfully this part of the house is 3-4 feet off the ground, so Todd’ll have room to work under there no problem, but we do have to cut into the existing floor to make it happen, so, yeah. That won’t be happening on a week night, it’s definitely a start early Saturday morning sort of project.

**Electrical and Plumbing in Stages

Everything in the room is moving, so almost all the supporting elements need to move, too. There’s an air vent under where the tub will go that will be re-routed to under the window, and an electrical outlet just above it that will move over to the new wall, under the light switch and next to the sink. I think. Then, of course, there’s the plumbing lines that all have to be moved.

Which ties into…

***Piece-meal Drywall and Painting

One thing we learned when we opened up the ceiling is that we do have room to raise the ceiling, at least on the hall-side, and slope it towards the exterior wall. This will make it feel less cave-like. There’s one pipe in the way, a big cast iron deal, that is the current commode’s vent. Because it’ll need to stay where it is (same with the vertical stack behind the current commode) until the new toilet is in place, that means the ceiling will need to be done later than the rest of (most of) the drywall. This is an inconvenience I can live with in exchange for higher ceilings.

Here’s a question–would you do the drywall and painting before you tile, or after? I think before, that way you’re not slopping paint over freshly laid tile and grout and have to be less careful. Not to mention this would also be before the fixtures go in and less funny angles to work in and around. Todd says it’s usually done the other way around. I suppose it doesn’t matter tremendously, since we’ll be doing things in a somewhat wonky order, anyway.

****Tiling Half the Room at a Time

Now, my one requirement for this project is that the room remain essentially functional for as long as possible. Which means that I don’t want the current toilet removed before the new one is installed. This is why half the room will be completed (walls, tiles, etc.) before the other half. Normally I’d want to be as efficient as possible, knocking all the drywall out at once, all the tile, all the painting. This is also a nod to Murphy’s Law, and a hedge against unforeseen delays, etc. I’d rather have guests using a half-finished bathroom downstairs than make them go upstairs, should we not make our deadline.

Ideally we’ll be able to work on smaller projects or tasks during the week, but I don’t want to depend on that too much since I know how our evening hours often find us drained or trying to take care of normal day-to-day stuff. And there are a few things that I can take care of on my own like fixing the window (more on that, later) and repainting the tub and painting and so forth when the time comes. At this stage of the game, though, it’s mostly Todd’s department since we’re dealing with structural stuff that I’m not as familiar with.

As far as budget goes, if you read the earlier post on the bathroom plans, I guesstimated about $2000 for the whole room, and we’re right around $400 spent so far. (Though that does include the reciprocating saw and blades, something that’ll be in use for far more than this one use, so give or take ~$100.) Still plenty left for drywall, tile, paint, and fixtures (and who knows what else).

IMG_20160117_202817503

A not-so-glamour shot of the wall-less bathroom after Sunday’s efforts.

While tearing down the walls we learned a few things:

  • The braintrust that built this room appears to have used floorboards for the walls. We thought it was beadboard, but that was just the “creative” spacing of the floor planks. It also meant that instead of removing panels, the walls came down one stubborn board at a time.
  • There’s evidence of fire damage in some of the studs and braces. Now, we know the upstairs caught fire in 1939, and the abundance of square nails in the framing leads us to believe this room might have been enclosed before the fire and suffered some damage during it. Whether it was a bathroom back then or not is anyone’s guess.
  • There’s a good chance that every time I ask Todd “Would you normally use <insert material or technique>?” Todd’s answer is going to be “If you’re going cheap.” This was the case for only putting a vapor-barrier on half the ceiling (of course the half that didn’t have the leak!), using quarter-round in front of the exiting baseboards (our stellar contractor’s option), and using larger quarter-round to “fill” an interior corner, among other things.This room was definitely the best first room to tackle in many regards!
  • We really need a shop-vac! (And a second pry-bar would have come in handy; you might notice in the video we keep trading the hammer and pry-bar depending on what section of wall we’re working on.) Dust masks are a must on this sort of project and my gel knee pads saved me when I was crawling around removing quarter round and baseboards. I have a feeling they’ll be a lifesaver when it comes time to tile!

That’s our progress so far! The next update (I hope to be able to do these weekly as the project continues) will include framing the new wall and installing the pocket door.